Grind Elemente
The connecting of rails
The rails must always be concreted in the ground. We recommend a hole with a diameter of 15-20 cm. The depth of the hole controls the actual height of the rail.
Curb
Item no. |
Height cm |
Length cm |
Width cm |
---|---|---|---|
2201 |
25 |
300 |
70 |
2202 |
30 |
300 |
70 |
2203 |
35 |
300 |
70 |
2204 |
40 |
300 |
70 |
2205 |
45 |
300 |
70 |
2206 |
50 |
300 |
70 |
2207 |
25 |
400 |
70 |
2208 |
30 |
400 |
70 |
2209 |
35 |
400 |
70 |
2210 |
40 |
400 |
70 |
2211 |
45 |
400 |
70 |
2212 |
50 |
400 |
70 |
2213 |
25 |
500 |
70 |
2214 |
30 |
500 |
70 |
2215 |
35 |
500 |
70 |
2216 |
40 |
500 |
70 |
2217 |
45 |
500 |
70 |
2218 |
50 |
500 |
70 |
2219 |
25 |
600 |
70 |
2220 |
30 |
600 |
70 |
2221 |
35 |
600 |
70 |
2222 |
40 |
600 |
70 |
2223 |
45 |
600 |
70 |
2224 |
50 |
600 |
70 |
Banana Curb
Item no. |
Height cm |
Length cm |
Width cm |
---|---|---|---|
2225 |
25 |
280 |
130 |
2226 |
30 |
280 |
130 |
2227 |
35 |
280 |
130 |
2228 |
40 |
280 |
130 |
2229 |
45 |
280 |
130 |
2230 |
50 |
280 |
130 |
Up-Down-Curb
Street Bank
Step Curb
Item no. |
Height cm |
Length cm |
Width cm |
---|---|---|---|
2233 |
20-40 |
300 |
150 |
2234 |
20-50 |
300 |
150 |
2235 |
30-50 |
300 |
150 |
2236 |
30-60 |
300 |
150 |
Step Curb KingSize
Item no. |
Height cm |
Length cm |
Width cm |
---|---|---|---|
2237 |
20-40 |
300/600 |
250 |
2238 |
20-50 |
300/600 |
250 |
2239 |
30-50 |
300/600 |
250 |
224 |
30-60 |
300/600 |
250 |
Step Curb Gap
Curb Combo 3 Level
Ledge-Wallie-Combo
Curb Combo 3 Level Ledge
Double Ledge Curb
Curb Land
Side covering
All boxes are covered with steel plates. We use 8 mm thick SKATESMART sheets for the driving surface. All steel parts are galvanized or partially powder-coated.